We're have a new pool!!!
Summer 2007
Since the new pool construction is now old news we have taken off the 9 pages of pool pics and selected a few as a reminder of the pool construction - from start to finish.
|
|
|
|
|
From the start... Take a good look - it's the old pool |
Day 1 - "What, no water!" 06/25/07 |
Anyone want to help break up the old pool? 06/26/07 |
|
|
|
|
|
Completed forming. The boards on the ends are in case of rain which might cause the sides of the pool to fall in. Sides are not shored up at this time. 07/13/07 |
Completed rebar ready to shoot concrete 08/02/07 |
Finishing the edges 08/02/07 |
|
|
|
|
|
Cabana - lots had to be re-built 08/14/07 |
Wire mesh finished, ready to pour cement for ramp 09/07/07 |
Nice looking steps 09/11/07 |
|
|
|
|
|
Installing the drain and pavers 09/19/07 |
Finishing touches on sidewalk 09/20/07 |
Pavers 09/18/07 |
|
|
|
|
|
Filling in with river rock 11/12/07 |
We'll have some tired backs tonight 11/12/07 |
Installing the new cabinets 12/04/07 |
|
|
|
|
|
|
This is what it's all about 11/12/07 To the finish... |
|
|
|
||